Client: Ford
Sector: Automotive
Company Size: Multinational
Service Provided: Diagnostic units delivery and installation
Dealership Installations: 175 (to date)
Sub-contracted by our pan-european partner ‘Snap-on’, It-Vault accepted the project to deliver and install diagnostic units for the Ford dealerships across Europe.
As with some of our other projects in the automotive industry, the biggest challenges we faced were concerns regarding time management and engineer availability. From ensuring each system is delivered on time, installed and functioning correctly to allocating engineers and planning their days & routes, our project managers and engineers have successfully delivered the project and installation across 175 dealerships with many more in progress.
Client: Honda
Sector: Automotive
Company Size: Globally Recognised
Service Provided: Diagnostic units delivery and installation
Dealerships to Service: 180 (UK) 200+ in Total.
Agreed Timeframe: 12 weeks
Project Delivery Time: 8 weeks
No. Engineers: 3
Honda sub-contracted IT-Vault for the HART Project to deliver and install their then-updated diagnostic units across 180 pan-european dealerships ready before the delivery their new vehicles.
At first the successful delivery of this undertaking was overshadowed by the challenges faced regarding resource and time management; from allocating engineers and arranging 180 journeys to each of the dealerships across Europe, to ensuring each system is delivered on time, installed and functioning correctly. However despite the obstacles, our dedicated team of engineers and managers worked tirelessly and with precision, managing to successfully deliver the project in only a month.
Client: Toyota
Sector: Automotive
Company Size: Globally Recognised
Service Provided: Diagnostic units delivery and installation
Dealerships to Service: 250 UK
Agreed Timeframe: 8 weeks
Project Delivery Time: 6 weeks
No. Engineers: 5
Working with Toyota, IT-Vault was contracted to deliver and upgrade Toyota’s diagnostic units across 250 UK dealerships in a two month timeframe.
With another 150 pan-european dealerships to service after installing the systems across Toyota’s UK dealerships, time management, precision and efficiency were once again the key factors contributing to the success of the project. Its successful delivery allowed Toyota to diagnose issues such as electrical and engine faults as well as any other possible vehicle malfunctions with improved speed and efficiency.
Successfully delivering the project 2 weeks before the deadline allowed IT-Vault to move forward with the installation for Toyota’s pan-european dealerships, resulting in 400 dealerships having the diagnostics units delivered and installed ahead of schedule.
Client: Bombardier
Sector: Aerospace and Transport
Company Size: Multinational
Services Provided: Active Wifi Survey and Windows 7 Rollout
Systems to Service: 120 UK
Agreed Timeframe: 6 weeks
Project Delivery Time: 6 weeks
No. Engineers: 4
When Bombardier, one of the leading Aerospace and Transport companies in the world planned to reoptimize the wifi network in operation in their Germany headquarters and rollout upgraded Windows 7 Systems in their UK HQ, IT-Vault was trusted with both projects, conducting active wifi surveys and optimising for better signal strength, connectivity and speed as well as carrying out the Windows 7 upgrade across 120+ systems.
With a total of 6 Weeks agreed for both projects to be completed, the management team assigned 4 engineers who successfully carried out the surveys accurately and upgraded Bombardier’s UK systems while preventing data loss and eradicating compatibility issues post-upgrade.
Client: BSN Medical
Sector: Healthcare
Company Size: Multinational
Services Provided: XP rollout, Windows 7 Upgrade
Systems to Service: 130+
Agreed Timeframe: 1 Week
Project Delivery Time: 4 Nights
No. Engineers: 4
In 2014, IT-Vault was contracted to carry out a full Windows XP rollout and upgrading over 130 DiskStation operated systems to Windows 7.
Among all industries in this ever changing world of technology advancements, healthcare is one of the most important sectors as the stakes for clients can be very high and even life threatening at worse, hence why they feel the need to seek treatment from a professional.
Our engineers had to make sure the project is delivered with accuracy and precision as any accidental data manipulation or misplacement could cause software malfunction or data loss which could have severe repercussions on the treatment or assessment of one or more clients. With the risks involved being identified ahead of the project, the management team carried out the necessary risk assessment and provided the required awareness training for the engineers to successfully deliver the project in 4 nights.